Table 3 Inter- and intra-group ISQ analysis and measurements on day of surgery and at 3-month follow-up
Table 3 Inter- and intra-group ISQ analysis and measurements on day of surgery and at 3-month follow-up
author: Murat Ulu,Erdem Kl,Emrah Soylu,Mehmet Krk, Alper Alkan | publisher: drg. Andreas Tjandra, Sp. Perio, FISID
Table 3 Inter- and intra-group ISQ analysis and measurements on day of surgery and at 3-month follow-up
Mean ± SD ISQ day 0 |
Mean ± SD ISQ at 3 month |
p | |
---|---|---|---|
Group 1 | 69.33 ± 8.48 | 77.77 ± 1.78 | .019 |
Group 2 | 68.88 ± 5.90 | 79.44 ± 2.55 | .001* |
Group 3 | 71.77 ± 5.71 | 75.11 ± 5.84 | .366 |
Group 4 | 70.44 ± 5.15 | 79.12 ± 4.61 | .022 |
p | .782 | .115 |
Serial posts:
- Reusing dental implants
- Background : Reusing dental implants
- Methods : Reusing dental implants (1)
- Methods : Reusing dental implants (2)
- Methods : Reusing dental implants (3)
- Methods : Reusing dental implants (4)
- Results : Reusing dental implants
- Discussion : Reusing dental implants (1)
- Discussion : Reusing dental implants (2)
- Discussion : Reusing dental implants (3)
- Table 1 Comparison of BIC percentages of over the entire implant length at 3-month follow-up
- Table 2 Comparison of BIC percentages of 3 mm crestal area of the implants
- Table 3 Inter- and intra-group ISQ analysis and measurements on day of surgery and at 3-month follow-up
- Figure 1. Flowchart of the research design employed in the study
- Figure 2. Edentulous posterior mandible of the dog at 3 months after tooth extraction
- Figure 3. Silk ligatures placed in a submarginal position around the implants
- Figure 4. A 2-month period was allowed for plaque retention and peri-implantitis
- Figure 5. Time arrow about the stages of the study
- Figure 6. BIC percentage measured with ImageJ analysis software